LIFT intersects 14 m at 1.55% Li2O at its Echo pegmatite, Yellowknife Lithium Project, NWT

VANCOUVER, British Columbia, March 19, 2024 (GLOBE NEWSWIRE) — Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 8 drill holes completed at the Echo, Fi Main, Fi Southwest & Nite pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights:

Read More

​