Goliath Successfully Completes 48,443 Meters Of Drilling in 97 Drill Holes in 94 Days, With A 100% Hit Rate And Expands Footprint Of High-Grade Surebet Gold Discovery To 2.01 Km2 That Remains Open, Golddigger Property, Golden Triangle, B.C.

Written by

in

TORONTO, Sept. 22, 2026 (GLOBE NEWSWIRE) — Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF) (the “Company” or “Goliath”) is pleased to announce that the 2026 drill program has concluded with over 48,000 meters drilled in 97 holes at the Surebet Discovery on its 100% owned Golddigger Property (the “Property”), Golden Triangle, British Columbia. The program confirmed the continuity of this large, high-grade, gold-rich system. 100% of the drill holes completed to date on Surebet have intersected quartz-sulphide mineralization, as well, 412 drill holes out of 483 or 85% contain VG-NE, clearly demonstrating the untapped discovery potential remaining on the property. Assays are still pending for 83 holes drilled in 2026.

Originally published via Source Article.